Project X To Do List
This is a shared to-do list for a project to record tasks that need to happen at some point, but not necessarily planned for any release occurring soon. To add an item, select the "+". To edit an item, select a black triangle. Each item includes Importance (scale 1-5) and Urgency (scale 1-5). To move an item to the completed list, open it and select "archive".

See completed task list


Title Owner Description Importance Urgency Date
call yew heng finance   check on balance
hello world
5 5 3/9/06
Enter the race in November Walt & Jing The car should be ready in time for the Electric Car 500 in November.
5 2 3/15/00
Improve the start-up performance Eric Start-up is when we need the most torque and current.
5 2 9/11/00
Recover power during breaking Martin The brakes will have to act as a power generator and recharge the batteries.
4 3 3/10/00
test test test
1 2 12/30/99
fff   ff
    9/15/05
Kindergarten Project  
    2/22/07

This page is powered by the Sparrow Web system for group editable web pages. The template from which this page was derived is
Copyright (c) 2000-2001 XEROX CORPORATION. All Rights reserved.