Project X To Do List
This is a shared to-do list for a project to record tasks that need to happen at some point, but not necessarily planned for any release occurring soon. To add an item, select the "+". To edit an item, select a black triangle. Each item includes Importance (scale 1-5) and Urgency (scale 1-5). To move an item to the completed list, open it and select "archive".

See completed task list


Title Owner Description Importance Urgency Date
Kindergarten Project  
    2/22/07
call yew heng finance   check on balance
hello world
5 5 3/9/06
fff   ff
    9/15/05
Improve the start-up performance Eric Start-up is when we need the most torque and current.
5 2 9/11/00
Enter the race in November Walt & Jing The car should be ready in time for the Electric Car 500 in November.
5 2 3/15/00
Recover power during breaking Martin The brakes will have to act as a power generator and recharge the batteries.
4 3 3/10/00
test test test
1 2 12/30/99

This page is powered by the Sparrow Web system for group editable web pages. The template from which this page was derived is
Copyright (c) 2000-2001 XEROX CORPORATION. All Rights reserved.